All tenders
Title : EOI FOR SELECTION OF BACKEND TECHNOLOGY PARTNER/CONSORTIUM PARTNER FOR EXECUTION IN TENDER FOR “DSETC OF 100 METER SELF SUPPORTING LATTICE STEEL TOWER INCLUDING PROVISIONS OF MOUNTING FOR INSTALLATION OF VHF FM ANTENNA ETC. AT AKASHVANI DWARKA,(GUJARAT)”
Reference Number :
Download File Size & Formats : 1541.8 KB (PDF)
Title : Withdrawal Notice: RFP for Empanelment of professional agency/ies for Media Monitoring and Analysis System for Print, Electronic, Digital, and Social Media for the Department of Public Relations, Government of Madhya Pradesh
Reference Number :
Download File Size & Formats : 444.25 KB (PDF)
Title : Withdrawal Notice: Expression of Interest (EOI) for selection of Back End Partner/ Systems Integrator for “End- to-end Supply, installation, configuration, testing, commissioning and integration of the required hardware and software components in the existing Data Centre environment at Sector 42, U.T. Chandigarh”
Reference Number :
Download File Size & Formats : 229.07 KB (PDF)
Title : Corrigednum 1: EOI FOR SELECTION OF BACKEND PARTNER/SYSTEM INTEGRATOR FOR “SELECTION OF SYSTEM INTEGRATOR (SI) FOR SELECTION OF AGENCY FOR CAMPUS WI-FI IMPLEMENTATION AT STATE PUBLIC UNIVERSITIES” UNDER HIGHER EDUCATION DEPARTMENT, GOVERNMENT OF ODISHA
Reference Number :
Details : Corrigendum uploaded on 8 October 2026
Download File Size & Formats : 324.41 KB (PDF)
Title : Corrigendum 1: RFP FOR Selection of SI for “Upgradation of post graduate laboratories (modular lab) and purchase and Installation of Scientific Equipment’s at main campus of Vijayanagara Sri Krishnadevaraya University, Bellary”.
Reference Number :
Details : Corrigendum uploaded on 8 October 2026
Download File Size & Formats : 191.43 KB (PDF)
Title : Corrigendum 1: RFP From the manufacturers for the Supply and Fixing of Hostel furniture’s, library furniture’s and furniture for other department of the university main campus of Vijayanagara Sri Krishnadevaraya University, Bellary.
Reference Number :
Details : Corrigendum uploaded on 7 October 2026
Download File Size & Formats : 155.18 KB (PDF)
Title : Corrigendum 2: EOI FOR SELECTION OF BACKEND PARTNER/SYSTEM INTEGRATOR FOR A-RECONSTRUCTION/ RENOVATION AND UPGRADATION OF FACILITIES AT BOOKING OFFICE OF STATIONS UNDER JURISDICTION OF SR.DEN/2. B-RECONSTRUCTION/IMPROVEMENT/ RENOVATION ALONG WITH UP-GRADATION OF FACILITIES AT BOOKING OFFICES UNDER JURISDICTION OF SR. DEN/3/HWH. C-POLIFERATION OF ATVM OVER HOWRAH DIVISION. D-UP-GRADATION OF PA SYSTEM AT SYAE, TKPR AND JSDG COACHING DEPOTS
Reference Number :
Details : Corrigendum uploaded on 7 October 2026.
Download File Size & Formats : 418.01 KB (PDF)